Getting climate, energy & environment news right.

Large loads face reliability requirements under MISO proposal

The Midcontinent Independent System Operator on Friday proposed a set of requirements large loads must meet before they can connect to the grid, including ramping and ride-through specifications.

The “interconnection reliability requirements” framework aims to improve MISO’s visibility into large load “characteristics and behavior, support reliable planning and operational decision-making, and establish scalable and technically justified expectations proportional to demonstrated reliability risk,” the grid operator said in its filing with the Federal Energy Regulatory Commission.

Read more in Utility Dive here.

The views and opinions expressed are those of the author’s and do not necessarily reflect the official policy or position of C3.

Thank you for signing up

Help us promote sensible solutions for both planet and prosperity.

Subscribe to our exclusive email designed for conservatives who care about climate.

Help us promote free market solutions for climate change.

5 Incredible Ways Economic Freedom Helps the Planet.

Sign up for our newsletter now to get the full list right in your inbox.

Download Now