Casablanca is moving ahead with a major waste-to-energy project aimed at tackling two infrastructure pressures at once: rising municipal waste volumes and demand for dependable electricity generation.
The planned facility, to be built northwest of the Mediouna landfill in the Casablanca-Settat region, is designed to process about 1.5 million tons of non-recyclable waste annually and generate 126 MW of baseload electricity.
The views and opinions expressed are those of the author’s and do not necessarily reflect the official policy or position of C3.
