Getting climate, energy & environment news right.

Casablanca Moves Ahead With 126 MW Waste-to-Energy Project

Casablanca is moving ahead with a major waste-to-energy project aimed at tackling two infrastructure pressures at once: rising municipal waste volumes and demand for dependable electricity generation.

The planned facility, to be built northwest of the Mediouna landfill in the Casablanca-Settat region, is designed to process about 1.5 million tons of non-recyclable waste annually and generate 126 MW of baseload electricity.

Read more in E+E Leader here.

The views and opinions expressed are those of the author’s and do not necessarily reflect the official policy or position of C3.

Thank you for signing up

Help us promote sensible solutions for both planet and prosperity.

Subscribe to our exclusive email designed for conservatives who care about climate.

Help us promote free market solutions for climate change.

5 Incredible Ways Economic Freedom Helps the Planet.

Sign up for our newsletter now to get the full list right in your inbox.

Download Now