After an earlier reform effort proved ineffective, the PJM Interconnection is taking a second swing at creating a pathway for bringing generation online by using surplus interconnection capacity at existing power facilities.
Surplus interconnection service, called SIS, allows a new generator or energy storage system to connect to the grid at a power facility’s existing interconnection point, using that asset’s excess capacity interconnection rights.
Read more in Utility Dive here.
The views and opinions expressed are those of the author’s and do not necessarily reflect the official policy or position of C3.
